Pre-loader

Gopal Chandra Roy

About


Graduated from IIT Kharagpur in the year 1991.

Worked more than fourteen years (September 1991 to December, 2005) in Jhanjra Project Mine (an underground coal mine belongs to Eastern Coalfields Limited, A subsidiary of Coal India Limited).

Joined in IIEST, Shibpur (Erstwhile BESU, Shibpur) December, 2005 and continuing.

Academic Qualifications


  • PhD
  • FCC(Coal)
  • M.Tech
  • B.Tech(Hons.)

Research Statement


Coal Mining, Mining Machinery, Operations Research

Latest Publications


  • 1 Roy, G. C. & Dey, N. C, Optimization of Time Duration to Install Face Equipment at Longwall Face in India Coal Mines, 598-606, 37th International Symposium on Application of Computers and Operations Research on Mineral Industries (APCOM 2015) organized by University of Alaska Fairbanks, United States in cooperation with The S, 2015
  • 2 Prasad, A. & Roy, G. C, Causes of Discrete Behaviour on Roof Sagging due to Underground Mining, 153-159, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, 2013
  • 3 Roy, G. C, Shale Gas: Technological Approach and Prospects in India, 45-58, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, 2013
  • 4 Prasad, A. & Roy, G. C, Impact of Significant Factors on Strata Control During Depillaring Operation with Continuous Miner in Underground Coal Mines in India, 19, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Scien, 2012
  • 5 Roy, G. C. & Dey, N. C, Development and Verification of Performance of Quick Setting Cement for Reduction of Roof Fall Accidents in Underground Coalmines, 28, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Scien, 2012
  • 6 Roy, G. C. & Dey, N. C., Optimization of Quick Setting Cement (QSC) Ingredients for Improving its Strength and Control Immediate Roof in Underground Mines, 107, 71-79, MGMI Transactions, 2011
  • 7 Prasad, A. & Roy, G. C, Instrumentation for Strata Control in Continuous Miner Face in Underground Coal Mines in India, 32(4), 3-15, Minetech, 2011
  • 8 Dey, N. C., Pal, S., Roy. G. C. & Sahana, S. K, A Look into Physiological Response of Selective Underground Coal Miners in the Ambit of Underground Environment, 32(4), 48-54, Minetech, 2011
  • 9 Roy, G. C. & Dey, N. C, Role of Some Critical Parameters on the Performance of Quick Setting Cement Installation with Roof Bolt in Underground Coal Mine, 147-151, National Seminar on Coal Mining “The Future of Overground Lies Below Ground”, jointly organised by DGMS and SCCL, Hyderabad 28th August 2010, 2010
  • 10 Roy, G. C. & Dey, N. C, Chemical Analysis of Cement Ingredients Suitable for Underground Coal Mines with SEM/EDX, 31, 50-55, Minetech, 2010
  • View More

    Research Areas


    • Safety and Communication in Underground Coalmines
    • Project Scheduling, Transportation Optimization
    • Strata Control and Monitoring in Coalmines

    Publications


  • 1 Roy, G. C. & Dey, N. C., Optimization of Quick Setting Cement (QSC) Ingredients for Improving its Strength and Control Immediate Roof in Underground Mines, 107, 71-79, MGMI Transactions, 2011
  • 2 Prasad, A. & Roy, G. C, Instrumentation for Strata Control in Continuous Miner Face in Underground Coal Mines in India, 32(4), 3-15, Minetech, 2011
  • 3 Dey, N. C., Pal, S., Roy. G. C. & Sahana, S. K, A Look into Physiological Response of Selective Underground Coal Miners in the Ambit of Underground Environment, 32(4), 48-54, Minetech, 2011
  • 4 Roy, G. C. & Dey, N. C, Chemical Analysis of Cement Ingredients Suitable for Underground Coal Mines with SEM/EDX, 31, 50-55, Minetech, 2010
  • 5 Roy, G. C. & Dey, N. C., Control Factors in Indian Longwall Mines, 46(10), 126-128, The Indian Mining & Engineering Journal, 2007
  • 6 Bhattacharya, J., Roy, G. C. & Ghosh, A. K, Planning a Longwall Mine Face and Performance Parameters – A Verification of Existing Design in Jhanjra Longwall Mine in Eastern Coalfields Limited, 13, 45-53, Minetech, 1992
  • 1 Roy, G. C. & Dey, N. C, Optimization of Time Duration to Install Face Equipment at Longwall Face in India Coal Mines, 598-606, 37th International Symposium on Application of Computers and Operations Research on Mineral Industries (APCOM 2015) organized by University of Alaska Fairbanks, United States in cooperation with The S, 2015
  • 2 Prasad, A. & Roy, G. C, Causes of Discrete Behaviour on Roof Sagging due to Underground Mining, 153-159, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, 2013
  • 3 Roy, G. C, Shale Gas: Technological Approach and Prospects in India, 45-58, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, 2013
  • 4 Prasad, A. & Roy, G. C, Impact of Significant Factors on Strata Control During Depillaring Operation with Continuous Miner in Underground Coal Mines in India, 19, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Scien, 2012
  • 5 Roy, G. C. & Dey, N. C, Development and Verification of Performance of Quick Setting Cement for Reduction of Roof Fall Accidents in Underground Coalmines, 28, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Scien, 2012
  • 6 Roy, G. C. & Dey, N. C, Role of Some Critical Parameters on the Performance of Quick Setting Cement Installation with Roof Bolt in Underground Coal Mine, 147-151, National Seminar on Coal Mining “The Future of Overground Lies Below Ground”, jointly organised by DGMS and SCCL, Hyderabad 28th August 2010, 2010
  • 7 Maiti, J. & Roy, G. C, Safety in Mining Supply Chain, 219-226, Proceedings of the International Conference on “Mineral Industry in the New Economy – Challenges and Opportunities”, January 15th – 16th, 2009, ISM Alumni Association, Kolkata Chapter, 2009
  • 8 Roy, G. C, An Overview on Breakdown of Face Equipment in a Longwall Face in India, 143-149, National seminar on Rock-Machine Interaction in Excavations Organised by Centre of Advanced Study, Department of Mining Engineering, I. T. BHU, 17th-18th March, 2008, 2008
  • 9 Roy, G. C. & Dey, N. C, Effect of Powered Support Design in Longwall Production Performance in India, 45-52, National Seminar on Productivity in Indian Coal Mines organised by World Confederation of Productivity Science, 18th-19th Jan, 2007,, 2007
  • 10 Roy, G. C. & Dey, N. C, An Overview on Breakdown of LHD and SDL in an Indian Underground Coal Mines, tech3/1-3/6, National Seminar on “New Mining Initiatives for Sustainable Development”, Organised by Bengal Engineering and Science University, Shibpur, 17th No. 2007, 2007
  • Patents


    # Patents Year

    Projects


    • Scientific study for assessing the long term stability of pillars at Shastry Colliery of Ballarpur Area, WCL, Consultancy
      Completed
    • Strata Monitoring and Management Plan for Extraction of Developed Pillars in Continuous Miner District, Sarpi Project, ECL, Consultancy
      Completed
    • Coal Sample Analysis of the Mines of Eastern Coalfields Limited, Consultancy
      Completed
    • Preparation of Sustainable Development Framework for Dongri Buzurg Mine, Consultancy
      Completed
    • Strata Monitoring in Continuous Miner District, Sarpi Project, ECL, Consultancy
      Completed
    • Coal Bed Methane Reserves Estimation for Indian Coalfields, Sponsored
      Completed
    • A Cost-effective and Efficient MATCHEM Model to Support Immediate Roof Having Developed Quick-setting Cement Based Capsules to Reduce Roof Fall Accident in Coal Mines, Sponsored
      Completed

    Research Groups


    Debapriya Mondal
    Ph. D.
    dmbiltu@gmail.com

    Created: 23 November 2019