Sl | Title | Client Organisation | PIs |
---|---|---|---|
1 | Design and planning of construction of Railway Wagon Facility for Ramsarup Industries Ltd, Kharagpur. | N K Instruments, Kolkata |
PI: Dr. Apurba Das Consultants: Dr. Amit Roy Chowdhury, Dr. Saptarshi Kundu |
2 | Technical Consultancy for Structural Stability Test of Concrete and Steel Structures of Ropeway transport system at Bagru Mines | HINDALCO INDUSTRIES LIMITED |
PI: Dr. Rajib Chakraborty Consultants: Dr. N C Dey, Dr. Apurba Das, Dr. Saptarshi Kundu |
3 | Finite Element Analysis for Load and Stress on Modular Cantilever Assembly for 25 KV AC Traction | AUMNI TRANSMISSION INDUSTRY PRIVATE LIMITED |
PI: Dr. Apurba Das Consultants: Dr. Amit Roy Chowdhury |
4 | Casting Simulation of Side Frame, Bolster, Centre Pivot Top & Bottom for CASNUB 22HS | BRAND ALLOYS PRIVATE LIMITED |
PI: Dr. Apurba Das Consultants: Dr. Amit Roy Chowdhury |
5 | Finite element analysis and calculation against Car Guide Rail for South Eastern Railway | AROHI ELEVATORS PVT LTD |
PI: Dr. Apurba Das |
6 | Model Shaft for 1MPS-13 Capacity (884 kgs) Elevator: LT Elevator Pvt Ltd | LT Elevator Pvt Ltd |
PI: Dr. Apurba Das Consultants: Dr. Saptarshi Kundu |
7 | Geotechnical and Feasibility study for Vanabar Ropeway Section I, Gaya | Damodar Ropeways & infra Ltd |
PI: Dr. Apurba Das Consultants: Dr. Saptarshi Kundu |
8 | Design and planning of construction of Railway Wagon Facility for Ramsarup Industries Ltd, Kharagpur | N K Instruments |
PI: Dr. Apurba Das Consultants: Dr. Amit Roy Chowdhury, Dr. Saptarshi Kundu |
9 | 13 PERSON CAPACITY LIFTS AT PLH STATION IN CONNECTING WITH AMRIT STATION OF WALTAIR DIVISION | LT Elevator Pvt Ltd |
PI: Dr. Apurba Das |
10 | Comparative Study of Different Types of Welded Joints between Copper Flange and Seamless Copper Pipe | Austenite Engineers |
PI: Dr. Apurba Das Consultants: Dr. Amit Roy Chowdhury |
Created: 23 November 2019 Last Updated: 24 May 2025