Pre-loader

Consultancy Projects

Sl Title Client Organisation PIs
1 Progressive (FY 16-17) mine closure verification for Gare Palma IV/4 and IV/5 mines Hindalco PI: Joint Consultant
2 Stability analysis of Pit and Overburden Dump Slopes WCL PI: Joint Consultant
3 Stability analysis of Pit and dump slopes WCL PI: Joint Consultant
4 Scientific study on physico-mechanical properties (PMT) of coal and coal measures rocks of a coal block KML PI: Consultant
5 Stability analysis of Pit and dump slopes WCL PI: Joint Consultant
6 Progressive Mine Closure Verification for Sial Ghogri coal mine PI: Consultant
7 Scientific study on physico-mechanical properties (PMT) of coal and coal measures rocks of a coal block PTPL PI: Joint Consultant
8 Scientific study on physico-mechanical properties (PMT) of coal and coal measures rocks of a coal block JDPL PI: Consultant
9 Scientific study on physico-mechanical properties (PMT) of coal and coal measures rocks of a coal block OMIPL PI: Consultant
10 Stability analysis of Pit and dump slopes WCL PI: Joint Consultant
11 Model Coal Sample Preparation for TARA (E&W) Coal Mines to achieve VM:17%-20% and GCV:GI2(3700-4000) & G13(3400-3700)Kcal/kg The West Bengal Power Development Corporation Limited
12 Study of EIA/EMP and Bank Protection Study in connection to permission for construction of new Electric Crematorium at Majher Chor in Kalyani under NMCG Program Kalyani Municipality PI: Prof. Debabrata Mazumder
13 Appraisal of DPR on “Construction of one Triple- Furnace Electric Crematorium at Pituri Ghat, Ward No. 1, Kamarhati Municipality in North 24 Parganas, West Bengal” National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
14 Appraisal of DPR on “Construction of Electric Crematorium at Barkola in Kharagpur, West Bengal National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
15 Appraisal of DPR on “Construction of Electric Crematorium in Barrackpore Municipality, West Bengal” National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
16 Appraisal of DPR on “Development of Electric Crematorium at Kaligunj, Murshidabad, West Bengal” National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
17 Appraisal of DPR on “Construction of Electric Crematoria, Kalyani, West Bengal” National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
18 Appraisal of DPR on “Development of Ghats in and around The Heritage/Spiritual City of Isckon, Mayapur, West Bengal” National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India 2021 National Mission for Clean Ganga (NMCG), Ministry of Jalshakti, Government of India PI: Prof. Debabrata Mazumder
19 Study of EIA/EMP and Bank Protection Study in connection to permission for construction of Steel Pontoon Jetty at Shalimar Works Limited Premises Shalimar Works Limited (1980) PI: Prof. Debabrata Mazumder
Consultants: Dr. Ashis Kumar Bera
20 Scientific study of West Kenda OCP of New Kenda colliery, Kenda Area, ECL as per regulation no. 138(1) and 37(2) c of CMR-2017, proposal for dealing/ sealing of fire in the developed galleries of disused working of R-Vl seam and stabilization of ground in the pot hole/ subsided area Eastern Coalfields Limited (ECL) PI: Prof. (HAG) N. C Dey
Consultants: Dr. Saptarshi Kundu
21 Scientific study of West Kenda OCP of New Kenda colliery, Kenda Area, ECL as per regulation no. 138(1) and 37(2) c of CMR-2017, proposal for dealing/ sealing of fire in the developed galleries of disused working of R-Vl seam and stabilization of ground in the pot hole/ subsided area Eastern Coalfields Limited (ECL) PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
22 Vetting of structural design and drawing of decking over nala for Metro railway project in Kolkata M/s Senbo Engineering Limited PI: Dr. Soumya Bhattacharjya
23 Vettinq of Structural Desiqn and Drawinqs for Sankrail Water Supply Scheme under PHE Directorate M/s G B Construction PI: Dr. Soumya Bhattacharjya
24 Vetting of Stability certificate of foot over bridge near Alipore zoo, for safe use of pedestrians M/s Karukrit advertising private Ltd. PI: Dr. Soumya Bhattacharjya
25 Vetting & checking of the structural design of trapezoidal combined footing at Tuticorin , Tamil Nadu :M/s DESCON UNITED TECHNICAL SERVICE PI: Dr. Soumya Bhattacharjya
26 Vetting & checking of the structural design of existing tower foundation at Tuticorin , Tamil Nadu M/s DESCON UNITED TECHNICAL SERVICE PI: Dr. Soumya Bhattacharjya
27 Root-cause-analysis of failure of Contact, Shoe (Paddle) made out of Ductile Iron and its corrective & preventive solution Ventury Moulding Pvt. Ltd., Kolkata PI: Swarup Kumar Ghosh
28 Investigation on Hydrogen Diffusion in High Entropy Alloy, Funding Agency: CSIR- Indian Institute of Petroleum PI: Pi - Snehanshu Pal
29 Optimizing minor constituents in blast furnace slag to operate 19-22 percentage slag Alumina, Funding Agency: Tata Steel Ltd. PI: Pi - Snehanshu Pal
30 Scientific monitoring of dump and pit slope stability by determining FOS and pore pressure at Basantimata Dahibari Colliery under CV area of BCCL Bharat Coking Coal Limited PI: Prof. Netai Chandra Dey
Consultants: Dr. Saptarshi Kundu
31 Scientific monitoring of dump and pit slope stability by determining FOS and pore pressure at Basantimata Dahibari Colliery under CV area of BCCL Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
32 Design and Development of HVDC and FACTS based Experimental Dynamic Model Set-ups M/s Calcutta Electric Supply Corporation Limited, Kolkata PI: Dr. Suvarun Dalapati
Consultants: Dr. Kaushik Mukherjee
33 Vetting of DPR for Convention Centre at Tura, West Garo Hills Director of Tourism Department, Govt. of Meghalaya PI: PI
34 Augmentation of 132/33 kV Mawlai Substation from (3 x 120) MVA to (3 x 50) MVA along with re-engineering of 133 kV bus bar Planning Departmnet, Govt. of Meghalaya PI: PI
35 Vetting of the methodology towards replacement of bearings of viaducts and interchanges of Vidyasagar Setu TPF Engineering Pvt. Ltd. PI: Dr. Soumya Bhattacharjya
36 Vetting of substructure of road over bridges on NH83 M/s Ram Kripal Singh Construction Pvt. Ltd. PI: Dr. Soumya Bhattacharjya
37 Vetting of RCC girder and deck slab of viaduct of road over bridge and vehicular underpass on NH83 in Bihar M/s Ram Kripal Singh Construction Pvt. Ltd. PI: Dr. Soumya Bhattacharjya
38 Vetting of Structural Design and Drawing (Civil and Structural part only) of Solid Waste Management Facility at Bansberia Municipality Tide Technocrats Pvt. Ltd. PI: Dr. Soumya Bhattacharjya
39 Vetting of Structural Design and Drawing (Civil and Structural part only) of OHR foundations, CWR cum pump house, GLR cum pump house including annex structures WPIL Ltd PI: Dr. Soumya Bhattacharjya
40 Vetting of structural design and drawing for the platform structure modification at Kavi Subhash Metro Station under Kolkata Metro Railways Bismi Construction PI: Dr. Soumya Bhattacharjya
41 Vetting of design of flooring work for Inspection shed and design of foundation & platforms for washing lines at Jheel Siding Coaching Depot, RVNL, ER, Howrah, WB
42 Proposal for Development of Bantala Greenfield City- Karmadiganta sponsored by Sector VI Industrial Township Authority Govt. of West Bengal under the 15th Finance Commission Performance based Challenge Fund for Incubation of New Cities by Govt. of India Sector VI Industrial Township Authority Govt. of West Bengal PI: Tuhin Subhra Maparu
Consultants: Souvanic Roy Arup Sarkar Keya Mitra Parthasarathi Mukhopadhyay Amitava Roy Subrata Kr. Paul Soumen Mitra Sutapa Das Bhaskar De Advisors: Anindya Mallick Sutanu Sen
43 Preparation of Geotechnical report on Highwall mining at Amalgamated Amlo Dhori Minsol India Private Limited PI: Prof. Netai Chandra Dey
Consultants: Dr. Saptarshi Kundu
44 Preparation of Geotechnical report on Highwall mining at Amalgamated Amlo Dhori MINSOL Limited PI: Prof. (HAG) N.C Dey
Consultants: Dr. Dipankana Bhattacherjee
45 Framing the Tripura State Solar Policy Ministry of Power, Tripura PI: Co-PI
Consultants: Co-PI
46 Study of Pattern of Energy Consumption and Installation of Energy saving Device Client- Industrial Repose, Pvt. Ltd. Howrah PI: Consultant
47 Widening/ Improvement to 4 (Four) Lane with Paved Shoulder of existing single lane from Srirampur (near Bhairiguri village) to Kachukhana Harichara Paglagaunj Section (PKG -I) of Srirampur to Dhubri Road of newly declared NH-127B of existing KM 0.000 to KM28.050 (Design KM. 0.000 to KM. 27.650), (Design Length= 27.650km) on EPC Bas is in the state of Assam under JICA Simplex Infrastructures Limited PI: Prof. Tapas K Roy
Consultants: Dr. Sujit Kumar Dalui and Dr. Saptarshi Kundu
48 Widening/ Improvement to 4 (Four) Lane with Paved Shoulder of existing single lane from Srirampur (near Bhairiguri village) to Kachukhana Harichara Paglagaunj Section (PKG -I) of Srirampur to Dhubri Road of newly declared NH-127B of existing KM 0.000 to KM28.050 (Design KM. 0.000 to KM. 27.650), (Design Length= 27.650km) on EPC Bas is in the state of Assam under JICA Simplex Infrastructures Limited PI: Prof. Tapas K Roy
Consultants: Dr. Sujit Kumar Dalui and Dr. Dipankana Bhattacherjee
49 Preparation of bid document for the proposed 'Green Field City' under 15th Finance Commission, Government of India, within Sector-VI Industrial Township Authority at Bantala, District: 24 Pgs. (South), Sector-VI Industrial Township Authority, GoWB
50 Preparation of bid document for the proposed 'Green Field City' under 15th Finance Commission, Government of India, within Sector-VI Industrial Township Authority at Bantala, District: 24 Pgs. (South) Sector VI Industrial Township Authority, West Bengal PI: Dr. Tuhin Subhra Maparu
51 Study and analysis of switching transients in the power distribution network of Durgapur Steel Plant (DSP), SAIL Development Consultants Private Limited (DCPL) on behalf of DSP, SAIL PI: Dr. Abhinandan De
52 Insulation Coordination of 220kV Gas Insulated Indoor Substation Development Consultants Private Limited (DCPL) PI: Dr. Abhinandan De
53 Technical Inspection and Certification of Darjeeling Rangeet Valley Ropeway Conveyor & Ropeway Services Pvt. Ltd., Kolkata PI: Prof. Amit Roychoudhury, Prof. Ashok Mitra and Prof. Abhinandan De
54 Scientific Study for determining the Safe Method of Working, Ultimate Pit Slope and Dump Slope with Monitoring of Slope Stability of Basantimata- Dahibari Colliery Under CV AREA-XII, BCCL. Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
55 Scientific Study for determining the Safe Method of Working, Ultimate Pit Slope and Dump Slope with Monitoring of Slope Stability of Basantimata- Dahibari Colliery Under CV AREA-XII, BCCL. Bharat Coking Coal Limited PI: Prof. Netai Chandra Dey
Consultants: Dr. Saptarshi Kundu
56 Flood Protection preparation plan for GU unit of ACC Cement at Kharagpur ACC Ltd PI: Ujjwal Saha
57 Widening and Up-gradation 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package 5) on Aizawl - Tuipang section of NH-54 in the state of Mizoram ABCI Infrastructures Pvt. Ltd. under National Highway & Infrastructure Development Corporation Ltd. PI: Prof. Tapas K Roy
58 Vetting of structural design and drawing of retaining wall cum boundary wall with drain at IOCL, Budge Budge Bismi Construction PI: Dr. Soumya Bhattacharjya
59 Vetting of NDT report for circular metro railway project at Kolkata The Freyssinet Prestressed Concrete Co Ltd PI: Dr. Soumya Bhattacharjya
60 Vetting of structural design and drawing (Civil and structural part only) of 60 mete Radio Tower for TATA STEEL LIMITED at Kalinga Nagar, Odisha S D Udyog Technologies PI: Dr. Soumya Bhattacharjya
61 Vetting of the load test report for the work of strengthening and restoring existing FOB near NRS hospital Progressive Construction Company PI: Dr. Soumya Bhattacharjya
62 Vetting of Structural design and drawings for structural support system at rail lowering cutout location at Kolkata Biman Bandar Metro Yard Project ITD Cementation India Limited PI: Dr. Soumya Bhattacharjya
63 Vetting of Structural design and drawings of Substructure & Foundation for ROB at Km 92.944 of NH-83 (DFCC Km 224.445 between Station Manpur & Kastha) Ram Kripal Singh Construction Pvt. Ltd. PI: Dr. Soumya Bhattacharjya
64 Preparation of Diversion plan of river Sukri and nallas passing through Tubed Coal Mine, Dist. Latehar, Jharkhand (PI) Develecto Mining Limited PI: Dr. Asok Adak
Consultants: Dr. Ujjwal Saha, Dr. Sujit Kumar Dalui, Dr. Soumya Bhattacharyay, Sandip Chakraborty and Prof. Ambarish Ghosh
65 Vetting of drawing/design related to process engineering, hydraulics, civil, structural and electromechanical works, etc. for 100 MGD water treatment plant at Uluberia WPIL PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak and Dr. Sujit Kumar Dalui
66 Reviewing, checking, vetting of design and drawing, etc. for 40 MGD water treatment plant within Mahestala Municipality TRADERS & ENGINEERS PRIVATE LIMITED PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak and Dr. Sujit Kumar Dalui
67 EIA/EMP Report in respect of Construction of a Steel Pontoon Jetty in the Premises of Shalimar Works Limited, Howrah PI: Prof. Debabrata Mazumder
Consultants: Dr. Chanchal Majumder and Dr. Asok Adak
68 Preparation of Catchment Area Treatment Plan for Tubed Coal Mine, Dist. Latehar, Jharkhand Develecto Mining Limited PI: Dr. Asok Adak
Consultants: Dr. Ujjwal Saha and Sandip Chakraborty
69 Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode, BLAPPL-GPPL (Joint Venture) PI: Prof. Tapas K Roy
70 Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode BLAPPL-GPPL (Joint Venture) under National Highway & Infrastructure Development Corporation Ltd. PI: Prof. Tapas K Roy
71 Widening and Up-gradation 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package 4) on Aizawl - Tuipang section of NH-54 in the state of Mizoram ABCI Infrastructures Pvt. Ltd. under National Highway & Infrastructure Development Corporation Ltd. PI: Prof. Tapas K Roy
Consultants: Dr. Dipankana Bhattacherjee
72 Preparation of Catchment Area Treatment Plan for Tubed Coal Mine, Dist. Latehar, Jharkhand Develecto Mining Limited PI: Ujjwal Saha
73 Calculation of the pipe length required for infiltration gallery at Suryanagar pump house and Damalia pump house for the water supply project for Asansole Municipal Corporation under AMRUT M/s M.C. Ghosh and Associates PI: Ujjwal Saha
74 Sukri River Diversion of Tubed Coal Mines Damodar Valley corporation PI: Ujjwal Saha
75 Veting of design calculation for K.D. Malaviya National Oil Museum of Guwahati Assam Creative Museum Designers PI: Prof. ArunChakraborty
Consultants: Prof. Ashis Kumar Bera, Prof. Soumya Bhattacharya
76 Study of EIA/EMP and Bank Protection Study in connection of permission for construction of steel Pontoon Jetty at Shalimar Works Limited Premises Shalimer Warks ( 1980)Limited PI: Prof. Debabrata Mazumder
Consultants: Prof. Ashis Kumar Bera, Prof. Asok Adak
77 Vetting of foundation of 400 CUM capacity 20 mtr staging height RCC elevated overhead tank reservoir at KODLA, Murshidabad M/s Kamrula Construction Company PI: Dr. Soumya Bhattacharjya
78 Vetting of foundation structure of Vapour recovery unit at HPCL terminal 1, Budge Budge, kolkata M/s Bismi Construction PI: Dr. Soumya Bhattacharjya
79 CFD analysis for provision of Ventilation at tunnel No. 1 in connection with JRBM-Imphal new BG line project, A/c North East Frontier Railway C. Doctor & Co. Pvt. Ltd., Kolkata PI: Dr. Debashis Pal
80 Strengthening and restoring existing FOB near NRS hospital, Sealdah M/s Progressive Construction Company PI: Dr. Soumya Bhattacharjya
81 Riverfront Development Plan in the Central Business District of Kolkata sponsored by Development Consultants Ltd. Kolkata Development Consultants Ltd. Kolkata PI: Souvanic Roy
82 Conservation and Redevelopment of Crawford Market, Mumbai sponsored by Development Consultants Ltd. Kolkata Development Consultants Ltd. Kolkata PI: Souvanic Roy
83 Green Building for Guest House and Ancillary Infrastructure at Digha for Students Health Home Students' Health Home, Kolkata PI: Souvanic Roy
Consultants: Subrata Kumar Paul & Soumen Mitra
84 Study of Tenure Issues and Pilot Action Plan for Improving Tenure Security for the Urban Poor in Metropolitan Kolkata sponsored by DFID, UK DFID, Govt. of UK PI: Souvanic Roy
Consultants: Subrata Kumar Paul & Soumen Mitra
85 Carrying Capacity Assessment and Strategic Plan for Bally Municipal Area sponsored by DFID, UK DFID, Govt. of UK PI: Souvanic Roy
Consultants: Subrata Kumar Paul Soumen Mitra Sudip Kr. Roy Manas Kr. Sanyal
86 Proposed New Town at Domjur, Howrah, for Howrah Improvement Trust DFID, Govt. of UK PI: Sibabrata Halder
Consultants: Souvanic Roy Sudip Kr. Roy Manas Kr. Sanyal
87 Draft Development Plan for Bally Municipal Area sponsored by DFID, UK DFID, Govt. of UK PI: Souvanic Roy
Consultants: Subrata Kumar Paul Soumen Mitra Parthasarathi Mukhopadhyay Sanjib Nag Sudip Kr. Roy Manas Kr. Sanyal
88 Howrah Development and Rejuvenation Plan for Howrah Improvement Trust sponsored by DFID, UK DFID, Govt. of UK PI: Souvanic Roy
Consultants: Soumen Mitra Sudip Kr. Roy Manas Kr. Sanyal
89 Kolkata City Development Plan for Kolkata Municipal Corporation sponsored by DFID, UK DFID, Govt. of UK PI: Sibabrata Halder
Consultants: Manju Halder Souvanic Roy Sudip Kr. Roy Manas Kr. Sanyal
90 Integrated Cluster Action Plan for Shyamaprasad Mukherjee Rurban Mission in Hooghly District, West Bengal sponsored by Ministry of Rural Development, Govt of West Bengal Ministry of Rural Development, Govt of West Bengal PI: Swati Saha
Consultants: Souvanic Roy Subrata Kr. Paul Soumen Mitra Sudip Kr. Roy Manas Kr. Sanyal
91 Slum Free City Plan of Action (SFCPoA) at Korba under Rajiv Awas Yojana ( RAY), Govt. of India sponsored by Stesalit Ltd. Stesalit Ltd. PI: Souvanic Roy
Consultants: Sudip Kr. Roy Manas Kr. Sanyal
92 Master Plan for ISI, Tejpur Centre for Indian Statistical Institute (ISI), Calcutta Indian Statistical Institute (ISI), Calcutta PI: Souvanic Roy
Consultants: Subrata Kumar Paul
93 Smart City Development Plan for Haldia sponsored by Haldia Municipality Haldia Municipality PI: Souvanic Roy
Consultants: Sudip Kumar Roy
94 Policy and Design Proposal for Heritage Walk in the Historic Core of Serampore sponsored by National Museum of Denmark National Museum of Denmark PI: Subrata Kr. Paul
Consultants: Souvanic Roy Soumen Mitra
95 Listing, Assessment and Grading of Heritage Buildings in Serampore’s Historic Core sponsored by National Museum of Denmark National Museum of Denmark PI: Souvanic Roy
96 Integrated Conservation and Development Plan for the Historic Core of Danish Serampore, West Bengal sponsored by National Museum of Denmark National Museum of Denmark PI: Souvanic Roy
97 Design and Construction of 668 Telephones Exchange and RLU Building, Shibpur, Howrah Calcutta Telephones, BSNL PI: Prof. C. L. Chakraborty and Prof. Arup Sarkar
Consultants: Prof. Ashok Dey
98 Renovation of Town Hall, Howrah Howrah Municipal Corporation PI: Prof. Arup Sarkar
99 Renovation of Kedarnath Arogya Niketan, Bali, Howrah Howrah Municipal Corporation PI: Prof. Arup Sarkar
100 Renovation of Writers' Building, Kolkata Government of West Bengal PI: Prof. Arup Sarkar
101 Preparation of DDP for Gayeshpur Municipality Department for International Development (DFID), UK PI: Prof. Aditya Bandyopadhyay, Prof. Arup Sarkar, Dr. Amitava Roy
102 Preparation of DDP for Dumdum Municipality Department for International Development (DFID), UK PI: Prof. Aditya Bandyopadhyay, Prof. Arup Sarkar, Dr. Amitava Roy
103 Vetting of RCC building at MouzaPatulia, Khardah M/s Siddha Waterfront LLT PI: PI: Dr. Saibal Ghosh, Consultant: Dr. Soumya Bhattacharjya, Dr. Sujit Kumar Dalui
104 Verification and certification of mine closure expenses for some coal companies
105 Vetting of design calculation and drawing of retaining wall in connection with proposed Andul-Baltikuri doubling work of KGP division of SE Railway, Howrah M/s Sudarshan Sengupta & Sons PI: Dr. Soumya Bhattacharjya
106 Vetting of structural drawings of WTP at Jangipur, Jangipur Municipality M/s POREL DASS WATER & EFFLUENT CONTROL PVT. LTD. PI: Dr. Soumya Bhattacharjya
Consultants: Dr. S Chakraborty
107 Vetting of structural design and drawings of 1.5 MG capacity underground reservoir cum booster pumping station and substation building at Bhadrakali trenching ground in ward no. 7 within Uttarpara-Kotrung Municipal Area, Hooghly M/s Progressive Construction Co PI: Dr. Soumya Bhattacharjya
108 Vetting of structural design and drawing of 0.5 MG capacity underground reservoir cum booster pumping station including sub-station building at Maniktala, Makhla zone, Hooghly within Uttarpara Kotrung Municipal area M/s Sarkar Construction PI: Dr. Soumya Bhattacharjya
109 Vetting of structural design and drawing of 1.5 MG capacity underground reservoir cum booster pumping station including sub-station building at Baidyabati Municipality area Hooghly M/s Dasgupta Construction PI: Dr. Soumya Bhattacharjya
110 Vetting of design calculation and drawing of proposed administrative building (G+3) and extension of IOH shed, feasibility report for provision of washing line covered shed over NCG-1 to NCG-4 at Santragachi M/s MEGASTRUCT PI: Dr. Soumya Bhattacharjya
111 Vetting of G+18 storied residential building in Kolkata M/s Elixir, Kolkata PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
112 Vetting of construction details of Mezzanine floor of Town hall building at HMC Howrah Municipal Corporation PI: Prof. K K Chattopadhyay
Consultants: Prof. Saibal Ghosh, Prof. Sujit kumar Dalui, Prof. Soumya Bhattacharjya
113 Vetting of 1100 cum overhead reservoir M/s D C Rakshit & Company PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
114 Vetting of multi-storied building of Air India M/s Shamvi Consultant, Patna PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
115 Health monitoring of Shalimar station building under construction M/s Panchadeep Construction Ltd PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya, Dr. Sujit Kumar Dalui
116 Inspection of slipform of Chimney at Rourkela M/s Bygging India Pvt Ltd PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya, Dr. Sujit Kumar Dalui
117 Vetting of boundary wall at Rajbandh, Durgapur M/s Bismi Construction, Kolkata PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
118 Structural design of B+G+16 administrative building at GM 20-23 in Nabadiganta Industrial Township KMDA PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
119 Vetting of International guest house at IIT KGP CPWD PI: Prof. K K Chattopadhyay
Consultants: Prof. Saibal Ghosh, Prof. Soumya Bhattacharjya
120 Proof checking of North Bengal Gate M/s Uttarbanga Unnayan Parshad PI: Prof. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
121 Vetting of DPR of tourism at Sabujdwip Hooghly, M/s Sikaria Divinity Pvt. Ltd PI: Prof. Saibal Ghsoh
Consultants: Dr. Soumya Bhattacharjya
122 Investigation of a warehouse roof collapse at Container Freight Station, transport Depot Road M/s BalmerLawrie& Co. Ltd PI: Prof. Saibal Ghosh
Consultants: Prof. K K Chattopadhyay, Prof. S Chakraborty, Dr. Soumya Bhattacharjya
123 Vetting of Structural Design of Proposed Multi-level Car Parking cum Residential and Commercial Complex at New Town, Kolkata HIDCO PI: Dr. Soumya Bhattacharjya
124 Vetting of structural design and drawing (Civil part only) of 2.0 MG capacity UG reservoir cum booster pumping station including sub-station building at Kanaipur Colony M/s S. Ghosh and Associates Pvt. Ltd. PI: Soumya Bhattacharjya
125 Structural design and drawing for retaining walls in connection with the construction of weir at Darakeswar river near Pump House, Adra M/s Modern Construction Company PI: Dr. Soumya Bhattacharjya
126 ICAP for four clusters of HOOGHLY DIstrict WEST BENGAL Ministry of Panchayat and Rural Development Govt. of West Bengal under Rurbern Mission Govt. of India PI: Dr. Swati Saha
127 Serampore Heritage Documentation and Proposal for Development of Heritage Walk National Museum of Denmark, Copenhegen, Denmark PI: Subrata Kr. Paul
Consultants: Souvanic Roy, Soumen Mitra, Ruchira Das
128 Scientific study for strata monitoring and management plan for extraction of developed pillars by CM in proposed panel P12, P10, P7A at Sarpi project Banklola Area Eastern Coalfield Limited PI: Prof. N.C Dey
129 Mine closure activities of u/g and opencast coal mines of Bharat Coking Coal Limited (BCCL) Bharat Coking Coal Limited (BCCL) PI: Prof. P.K.Paul
Consultants: Prof. N.C.Dey
130 Mine closure activities of u/g and opencast coal mines of Singareni Collieries Company Limited (SCCL) Singareni Collieries Company Limited (SCCL) PI: Prof. S. Mukhopadhyay
Consultants: Prof. N.C.Dey
131 Coal grade sampling and proximate analysis of coal samples WBPDCL PI: Prof. N.C Dey
132 Coal grade sampling and proximate analysis of coal samples WBPDCL PI: Prof. N.C Dey
133 Roof stress monitoring and designing of support system in Bankola mines Bankola Area, Eastern Coalfields Limited PI: Prof. N.C Dey
134 Effective utilization of dragline in block – II opencast mines Bharat Coking Coal Limited (BCCL) PI: Prof. N.C Dey
135 Scientific study for Sharda Highwall Mining Cuprum Bagrodia Limited (CBL) PI: Prof. N.C Dey
136 Scientific study for ShardaHighwall Mining Cuprum Bagrodia Ltd PI: Prof. N.C Dey
137 Scientific study for Sharda Highwall Mining Cuprum Bagrodia Ltd PI: Prof. N.C Dey
138 Study of soil geometry and effectiveness of various environmental control measures in mining areas Hindalco Industries Ltd PI: Prof. N.C Dey
139 Coal grade monitoring and sampling Eastern Coalfield Limited PI: Prof. N.C Dey
140 Testing of different rock samples for planning of OCP CESC (Coal mines) PI: Prof. N.C Dey
141 Testing of different rock samples for planning of OCP CESC (Coal mines) PI: Prof. N.C Dey
142 Soil geochemistry, fertility and effectiveness of various environmental control measures for Bagru Mines, Lohardaga, Jharkhand Hindalco Industries Limited PI: Prof. N.C Dey
143 Mugma Colliery, ECL Bharat Coking Coal Limited (BCCL) PI: Prof. N.C Dey
144 Testing of chemical composition of cement capsules for underground roof support. Mugma Colliery, ECL PI: Prof. N.C Dey
145 Geo-technical study of rocks and analysis of coal seam gassiness for Muraidih underground coal mine in BCCL Minop Innovative technologies pvt limited PI: Prof. N.C Dey
146 Analysis and interpretation of stress cell and extensometer data from Shardahighwall mining of SECL taken up by CBL Cuprum Bagrodia Limited (CBL) PI: Prof. N.C Dey
147 Scientific study considering geo-technical data of RVIII seam (T) (B) of NKJ unit and preparation of SCAMP Eastern Coalfields Limited PI: Prof. N.C Dey
148 Coal grade estimation of WBPDCL mines West Bengal Power Development Corporation Limited PI: Prof. N.C Dey
149 To conduct grade analysis of three old coal stock heaps at 27F, 27J and 27K of Damagoria under CV area of BCCL Bharat Coking Coal Limited PI: Prof. N.C Dey
150 Preparation of proposal for rain water harvesting of artificial recharge of KhagraJoydev coal block at Birbhum district KhagraJoydev Coal Block PI: Prof. N.C Dey
151 Scientific study for strata behavior in panel 9B of RVII seam of Sarpi project of Bankola area ECL Eastern Coalfield Limited PI: Prof. N.C Dey
152 Scientific study for strata behavior in panel 9A of RVII seam of Sarpi project of Bankola area ECL Eastern Coalfields Limited PI: Prof. N.C Dey
153 Scientific study for assessing long term stability of pillars in top and bottom section and scientific way for development and extraction of pillars in R6 F Panel of Sasti Mine of Ballarpur area of WCL. Western Coalfields Limited PI: Prof. N.C Dey
154 Ergonomic study of Non – transport machineries being used in underground mines of CIL(Nawaapara u/g mines of Bhatgaon Area SECL) Coal India Limited PI: Prof. N.C Dey
155 Mine closure BCCL PI: PI
Consultants: S.Mukhopadhyay, P. Duta, N.C. Dey, G.C.Roy, Md. M. Islam
156 Vetting of Design Calculation of 160 m3/h capacity Arsenic Removal Unit at NASIRKUL and, KAMALPUR, ZONE-I, NADIA under PHED, Govt. of W.B Govt. of W.B PI: Prof. Debabrata Mazumder
Consultants: Prof. CHANCHAL MAJUMDER
157 Detailed Hydrological study of Sub-Surface water flow/ storage water characteristics for creation of sustainable source of rain fed river for semi-arid and fluoride affected Blocks in connection with comprehensive water security plan under Purulia, Bankura and Birbhum District Govt. of W.B PI: Prof. Kalyan Kumar Bhar
Consultants: Prof. CHANCHAL MAJUMDER
158 Vetting of RCC foundation and Flooring of proposed car depot at Kavi Subhas M/S Akriti Architechtural Consultant PI: Prof. Arun Chakraborty
Consultants: Prof. Ashis Kumar Bera
159 Vetting of proposed intake structure design & bank protection methodology for Pandua-Bangladesh Water Supply Scheme M/S Srijan Ecological Upliftment Private Ltd PI: Prof. Arun Chakraborty
Consultants: Prof. Ashis Kumar Bera
160 Testing and analysis of pond ash, bottom ash and steel plant slag material in ash dyke as substitute of sand NTPC- SAIL Power Corporation Company Pvt LTD PI: Prof. Ashis Kumar Bera
Consultants: Prof.Ambarish Ghosh
161 Analysis of Glass Fibre M/s Sardip Consulting Engineers PI: Prof. Ashis Kumar Bera
Consultants: Prof.Ambarish Ghosh
162 ‘1829 mm (OD) MS transmission pipe line from intake works at Rani Debendrabala Ghat on River Hooghly to Water treatment Plant at New Town in Action Area – 1A for 100 MGD Transmission Capacity ( DRC/SIL/CON?CE/SKG/028/13-14 ) Public Health Engineering Department (PHED), Government of West Bengal & M/s Simplex Infrastructure Ltd. Third Party Consultant PI: Prof. Saibal Kumar Ghosh
163 Inspection of Vidyasagar Setu Along With Approach Viaducts & Interchanges’ Under Hoogly River Bridge Commission ( SL. No. 22 of 2011-12 ). Hooghly River Bridge Commissioner (HRBC) PI: Prof. Saibal Kumar Ghosh
164 The Design of the modified support system for the over ground 36 inch diameter crude Oil jetty Line at HBCPL, Haldia Indian Oil Corporation Ltd, Pipe line Division: Pipeline-Eastern Region PI: Prof. Kalyan kumar Chattopadhyay
165 Consolidated drained triaxial tests for Underground tunnel section of East West Metro of Calcutta, M/S S. K. Mitra & Associates, Calcutta PI: Prof. Ambarish Ghosh
166 Vetting of structural design and drawing for the construction of Auditorium cum Marriage Hall of Ramjibonpur Municipality Ramjibonpur Municipality PI: Dr. Soumya Bhattacharjya
167 Vetting of structural design and drawing of 1.0 MG capacity underground reservoir cum booster pumping station including sub-station building at Rishra Municipality area Hooghly M/s Dasgupta Construction PI: Dr. Soumya Bhattacharjya
168 Vetting of structural design and drawing of 1.0 MG capacity underground reservoir cum booster pumping station including sub-station building at Champdani Municipality area Hooghly M/s Prasun Enterprise PI: Dr. Soumya Bhattacharjya
169 Research services for barrels MSF Govt of India PI: Sukumar Kundu
170 Comparative Techno-Commercial feasibility study of Seamless Stainless Steel, Mild steel, and Electroplated Seamless Mild Steel tubes for airbrake application in Indian railways Lalbaba Seamless Tube Pvt. PI: Sukumar Kundu
171 Strata Control and Monitoring Plan (SCAMP) for 3 mines SECL PI: Joint Consultant
172 Progressive mine closure verification for 43 mines BCCL PI: Joint Consultant
173 Re-Assessment of Howrah Dewatering Scheme for Construction of UG Howrah Station under East West Metro Rail Project, Contract :UG-1 TRANSTONNELSTROY – AFCONS J. V
174 Re-Assessment of Vent Shaft & New Mahakaran Dewatering Scheme for Construction of UG Vent Shaft and New Mahakaran Station” under East West Metro Rail Project, Contract :UG-1 TRANSTONNELSTROY – AFCONS J. V
175 Measures for river bank protection adjoining the proposed G+XI - Primarily Residential Building at Premises No. 20 & 22 B.G.T. Road, Mouza- Bhadrakali, Uttarpara, Dist. – Hooghly, West Bengal Regent Hirise Pvt. Ltd.
176 Design of Riverbank Protection for Proposed Jetty at Kukrahati Bengal Concessions Private Ltd.,
177 Study and Design Engineering of Sheet Pile for Shore Protection against Massive Erosion to save Century Old IGWTP, Palta Bridge and Roof Co.(India) Ltd.
178 Petrographic Analysis of Rock Samples related to Chennai Metro Construction CE testing Ltd. PI: Dr.Ananya Mukhopadhyay
179 Study of EIA/EMP and Bank Protection Study within Port limits in Halisahar Municipality Kolkata Metropolitan Development Authority PI: Debabrata Mazumder
Consultants: Chanchal Majumder, Asok Adak and Anirban Gupta
180 Vetting of Drawing & Design of Arsenic cum Iron Removal Plant (AIRP) under PHE DTE., West Bengal Effluent and Water Treatment Engineers Pvt. Ltd. PI: Debabrata Mazumder
Consultants: Chanchal Majumder
181 Selection of material for motor key of diesel fuel pump for Indian Railways Signotron India Pvt. Ltd, Kolkata PI: Swarup Kumar Ghosh
182 Failure analysis of pipe sample from oxygen plant, ESL, Bokaro ESL PI: Swarup Kumar Ghosh
183 Problem of decarburization of various bolts Rahee Infratech Limited PI: Swarup Kumar Ghosh
184 Heat treatment defects of various metal pins Shalimar Industries Limited PI: Swarup Kumar Ghosh
185 Vetting of Detailed Project Report of Haora River Bank Sanitation Project, Agartala National River Conservation Directorate (NRCD), Ministry of Environment and Forests, Government of India PI: Dr. Debabrata Mazumder
186 Provision of safe Drinking water in MP-LAD of 24 Howrah Parliamentary Constituency Howrah Improvement Trust (H.I.T.) PI: Dr. Debabrata Mazumder
187 ARU Installation Project Public Health Engineering Directorate, Govt. of West Bengal PI: Dr. Debabrata Mazumder
Consultants: Prof. Pratip Bandyopadhyay
188 Review of Deflouridation, Desalination and Iron Removal Plant located in Rajasthan, Andhra Pradesh, Tamilnadu, Tripra and Pondichery Rajiv Gandhi Drinking Water Misson, Ministry of Rural Development, Government of India PI: Dr. Anirban Gupta
Consultants: Dr. Debabrata Mazumder
189 Quality Control Assurance Services for Bakreshwar Thermal Power Plant. BHEL
190 Proof Checking for R. C. C. Jetty of a minor fishing harbor to be constructed at Sultanpur, Diamond Harbor
191 Checking and Vetting of design of 3million gallon underground water reservoir cum pumping station for 30 MGD capacity water treatment plant at Kalyani.
192 Vetting of structural design and drawing of residential complex for Jute Research Institute at Calcutta
193 Vetting of design of 53 railway bridges for construction of railway track from coal mines at Raigarh, RITES ltd.,
194 Proof checking of hydroelectric power station Rina Mini Hydel Project (2X 1000KW)
195 Proof checking of design of monocable passenger ropeway at Trikut Hill, Deoghar; Jharkhand
196 Nondestructive test on Turbo Generator Deck of ongoing Thermal Power Plant construction at Amarkantak
197 Nondestructive test on Turbo Generator Deck of ongoing Thermal Power Plant construction at Jharsuguda,
198 Proof checking for foundation, substructures & superstructure with PSC Girder for ROB near Basanti Colony, Rourkela SE Rly
199 Proof checking of Skew Twin Bridges No GPL/4 for Gangavaram port, for
200 Proof checking of five culvert Bridges for Gangavaram port,
201 Proof checking of five culvert Bridges for private siding at Barajamda-Barbil.
202 Proof Checking of Substructures for 6 nos bridges from Jharsuguda to Sardega
203 Checking of 28.05m span through welded girder for HML loading standard of Indian Railway. Rawatsons Eng Pvt. Ltd.
204 Checking fabrication and erection of Bridge No. 78 at KM 269/6-270/0 on River Gandak Bihar East Central railway
205 Fire Damage assessment of LIC Building Kolkata
206 Checking and Vetting of design of seven bridges for M/s MCL Samabalpur
207 Vetting of design of abutments of proposed rail lines for M/s Mahanadi Coalfield Ltd Samabalpur
208 Inspection of passenger ropeway, Darjeeling
209 Checking of Pipe conveyor over Railway bridge
210 Inspection of Vidyasagar Setu along with approach viaducts and interchange, 2011 HRBC
211 Investigation of a warehouse roof collapse at Container Freight Station, transport Depot Road
212 Third party consultancy for 100MGD Water Transmission Project from Hooghly River to New Town, Rajarhat Simplex
213 Vetting of structural design of the proposed construction of East Bidhannagar Police Station, Police Lines, Barracks etc. under Bidhannagar Police Commissionerate
214 Vetting of Design and Structural drawing of State Hut building at Dhakuria
215 Vetting of Design & Structural drawing for Indirect Fume Extraction job at Rail Wheel Factory, Yelahanka, Bangalore
216 Technical advisory service for a nuclear facility (Away from Reactor Spent Fuel Facility) at the Kudankulam Nuclear Power Project I & II, under Nuclear Power Corporation of India Ltd.
217 Health check-up of Bansbaria ROB and Saraswati Minor Bridge
218 Structural condition assessment of UNB building within NRS Medical College and Hospital, Kolkata
219 Proof checking of structural design and structural stability certification of Swarnamani Tower-5, a 35 storied building
220 Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements: Aizawl-Tuipang section of NH-54 in the state of Mizoram ABCI INFRASRTUCTURES PVT. LTD. PI: PI
Consultants: Prof. Sudip K Roy, Dr. Sujit Dalui, Dr. Pritam Saha, Dr. Dipankana Bhattacherjee
221 Evaluation of typical welded joints used for constructional grades of steel Institute for Steel Development and Growth
222 Stainless steel for construction segment Institute for Steel Development and Growth
223 Vetting of design document and drawing of single layer strut-waller system for Kolkata Biman Bindar Metro Yard project M/s ITD Cementation PI: PI: Dr. Soumya Bhattacharjya,
224 Vetting of slipform structure at Rourkela 18 M/s Basu and associates, Kolkata PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
225 Vetting of G+7 storied administrative building at DM office, Barasat M/s KMDA PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
226 Pedestrian underpass at Narkeldanga main road crossing EM bypass M/s Vardhaman Engg Works, Delhi PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
227 Vetting of Kalyani Auditorium, KMDA PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
228 Proof checking of Pipe bridge at Dhakuria M/s Indian Oil Limited PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
229 Vetting of State hut at Dhakuria M/s Panchadeep Construction PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
230 Vetting of WB Joint Entrance Board building M/s Bridge & Roof PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
231 Proof Checking of Design and Drawing of Drainage Pumping Station at AkandaKeshari in AA-IIID New Town Kolkata Public Health Engineering Directorate, Govt. of West Bengal PI: Dr. Saibal Ghosh
Consultants: Dr. Soumya Bhattacharjya
232 Proof checking of design and drawing of warehouse, office and dormitory building, at Agartala, Tripura M/s RITES Ltd. PI: PI: Dr. Soumya Bhattacharjya,
Consultants: Prof. Saibal Ghosh
233 Vetting of bearing design for bridge project M/s Oriental Ltd. PI: PI: Dr. Saibal Ghosh, Consultant: Dr. Soumya Bhattacharjya
234 Technical comment regarding stability of the garage building of Tower building premise at Haldia Dock Complex Kolkata Port Trust PI: Tapash Kumar Roy
235 Technical Consultancy Service towards development & strengthening of public road infrastructure from Anchorage Camp at Haldia Township to Durgachak Level Crossing, Haldia. Kolkata Port Trust PI: Tapash Kumar Roy
236 Technical comment regarding the Health Study and preparation of Qty estimate in connection with repairing work as would be necessary for refurbishment of the Road over Bridge (ROB) at Vidyasagar, Chiranjibpur, Haldia Kolkata Port Trust PI: Tapash Kumar Roy
237 Structural consultancy service for slum development project KMC PI: Dr. Soumya Bhattacharjya
238 Vetting of structural design of entrance gate at plaza area of Gitabitan Township, Bolpur M/s HIDCO PI: Dr. Soumya Bhattacharjya
239 Vetting of design and drawing of telecom tower M/s Tirupati Enterprises PI: Dr. Soumya Bhattacharjya
240 Vetting of design and drawing of an underground reservoir with pump house M/s AMAL DUTTA ROY PI: Dr. Soumya Bhattacharjya
241 Vetting of B+G+23 storied building at Kolkata, M/s J.C. Overseas, PI: PI: Dr. Saibal Ghosh, Consultant: Dr. Soumya Bhattacharjya
242 Design review of Suroor bridge at Pune- Satara Highway M/s ITD Cementation PI: PI: Dr. Saibal Ghosh, Consultant: Dr. Soumya Bhattacharjya
243 Stability test of two bays of steel factory M/s metal and steel factory, Ichhapore, Govt. of India PI: PI: Dr. Saibal Ghosh, Consultant: Prof. Sugato Pal and Dr. Soumya Bhattacharjya
244 Vetting of distressed bridge girders across feeder canal at Farakka M/s Royal Infracontru Ltd PI: PI: Dr. Saibal Ghosh, Consultant: Dr. Soumya Bhattacharjya
245 Vetting of Design & Drawing of Railway Bridges Chaitanya Projects Consultancy Pvt. Ltd. PI: Saibal Kumar Ghosh
246 Vetting of "Unified Campus of Bose Institute" Bose Institute, Govt. of India PI: Saibal Kumar Ghosh
247 Soil Exploration Work at six Plots of HIT, Howrah Howrah Improvement Trust, Government PI: Ambarish Ghosh
248 Assessment of vibration emanating from installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata - 700017 M/S Express Devcon Pvt. Ltd. PI: Ambarish Ghosh
249 Vetting of Structural Design & Drawing of Launching Girder 02 Simplex Infrastructures Limited, Kolkata PI: Saibal Kumar Ghosh
250 Redesign of Boundary Wall for Project Site at Kulpi Bengal Shipyard Limited, Kolkata PI: Saibal Kumar Ghosh
251 Soil Investigation Work for Construction of Multipurpose Cyclone Shelters at Amtalia Village, Deshapran Block, Purba Midnapur, West Bengal Engineering Projects (India) Limited PI: Kalyan Kumar Chattopadhyay
252 Pile Integrity testing of in-situ-bored piles IVRCL Limited Kalyani PI: Ambarish Ghosh
253 Distress signs at various locations of the buildings of the Primary Health Centre at Lakhuria, Burdwan Burdwan Zilla Parishad PI: Sudip Kumar Roy and Ambarish Ghosh
254 Vetting of Design and Drawing for Slip Form Shuttering for Chimney Structure at Vizag Basu & Associates, Kolkata PI: Saibal Kumar Ghosh
255 Vetting of Design and Drawing for G+11 Storied Building under Howrah Municipal Corporation Vijai Shree Ltd., Kolkata PI: Ambarish Ghosh
256 Vetting/Approval of the Designs of Diaphragm wall system at IB 167, Sector - III, Salt Lake City, Kolkata Traders & Engineers Private Ltd. PI: Ambarish Ghosh
257 Proof checking of Design and Drawing for Pile Foundation of 5 nos Bridges from Bankura to Mukutmanipur of South Eastern Railway MBB Consultancy Services Pvt. Ltd., Kolkata PI: Saibal Kumar Ghosh
258 Consultancy job for Stress analysis of RCC chimney and Fan Foundation Descon United Technical Service PI: Amit Roychowdhury
259 Consultancy & Contingency Charges for determination of Flexural Properties of GRP Liners Michel BAU GmbH & Co. KG PI: Arun Kumar Chakraborty
260 Consultancy for Geotechnical analysis of Mahuagarhi Coal block Mahuagarhi Coal Company Pvt. Ltd. PI: Pratik Dutta
261 Dynamic load test Larsen & Toubro Limited, Construction Infrastructure IC PI: Ambarish Ghosh
262 Proof Checking of Detailed Design and Drawing of the Foundation of Railway Bridges: in connection with gauge conversion work of Sakri Nirmali & Jhanjharpur - Laukaha Bazar Section, East Central Railway Basic & Progressive Concept INDIA PI: Ambarish Ghosh
263 Study on the feasibility of providing separate sewer system in un-sewered areas of Kolkata under proposed KEIP-II Project Kolkata Municipal Corporation PI: Anirban Gupta
264 Vetting of 1100 Cum Water Reservoir at Madhyamgram Amal Dutta Roy, Kolkata PI: Saibal Kumar Ghosh
265 Investigation of a building at Kolkata Kolkata Municipal Corporation PI: Saibal Kumar Ghosh
266 Soil report & Vetting of design - G.J. Khan Pumping Station Traders & Engineers Private Ltd. PI: Ambarish Ghosh
267 Preparation of Validation report of Soil data - Intake Jetty with Pump House under Panihati Municipality Traders & Engineers Private Ltd. PI: Ambarish Ghosh
268 Vetting of Garment Park HRBC, Govt. of WB PI: Saibal Kumar Ghosh
269 Vetting of G+3 Storied Building at Uttarpara, Hooghly Chandi Prosad Khanra, Howrah PI: Saibal Kumar Ghosh
270 Vetting of Bridges MBB Consultancy Services Pvt. Ltd., Kolkata PI: Subrata Chakraborty
271 Pile Integrity Test (PIT) with PIT Collector Model for E K Tower Shrachi Burdwan Developers Pvt. Ltd. PI: Ambarish Ghosh
272 Consultancy Services on Environmental Study for the "Preparation of Pre-Feasibility Study Report for Selected State Highway Corridors in West Bengal for Taking up in DBFOT Pattern or EPC Mode" RITES Ltd. (A Govt. of India Enterprise) PI: Manas Kumar Sanyal
273 Vetting of G+13 SGO Complex at Salt Lake for the Dept. of Urban Development, Govt. of West Bengal Partha Das & Associates PI: Saibal Kumar Ghosh
274 Vetting/checking of design calculations and drawings of RCC-structures for construction of "G+8" stroried residential building of Setu Co-operative Housing Society Ltd. at New Town, Kolkata Setu Co-operative Housing Society Ltd., Kolkata PI: Arun Kumar Chakraborty
275 Consultancy service for Geotechnical study of Nimbri Chandawatan project Binani Cement Limited PI: Pratik Dutta
276 Consultancy Services for Fortune Multispeciality Hospital Pvt. Ltd. Fortune Multispeciality Hospital Pvt. Ltd. PI: Ambarish Ghosh
277 Jhargram Guptamani Project BIAIPPL PI: Sujoy Kumar Saha and six other Professors
278 Design of steel shoring for construction of basement for proposed Commercial Building at Nagerbazar, Dumdum Shelter Kolkata PI: Saibal Kumar Ghosh
279 Vetting of Design & Drawing - Intake Jetty with Pump House under Panihati Municipality Traders & Engineers Private Ltd. PI: Ambarish Ghosh
280 Vetting of Design & Drawing of Bridges in Bihar Chaitanya Projects Consultancy Pvt. Ltd. PI: Saibal Kumar Ghosh
281 Vetting of Slip Form Shuttering Prasad & Co. Limited PI: Saibal Kumar Ghosh
282 Independent Assessment of effect of vibration, emanating from installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata - 700017, on the adjoining structures and providing guidance to the construction team M/S Express Devcon Pvt. Ltd. PI: Ambarish Ghosh
283 Soil Exploration Work at five Sites of Burdwan Medical College Campus Burdwan University Division, P.W. (CB) Directt., Govt. of West Bengal PI: Ambarish Ghosh
284 Vetting of Estimates Burdwan Development Authority PI: Tapas Kumar Roy
285 Technical Vetting of Estimates of Electrical Schemes, DSDA Digha Sankarpur Development Authority, Purba Medinipur PI: Ashok Kumar Maitra
286 Measurement of vibration due to sheet pile driving at "THE 42" at 42B, Chowringhee Road, Kolkata 700071 Chowringhee Residency Pvt. Ltd. PI: Ambarish Ghosh
287 Vetting of the Estimates Haldia Development Authority PI: Pranab Kumar Lai
288 Consultancy Services for Dyke on the Western Fringe of Sagar Island, KoPT Kolkata Port Trust PI: Ambarish Ghosh
289 Consultancy Service for Krishnapur Road Rajarhat - Golpark Municipality PI: Sudip Kumar Roy
290 Vetting of Design & drawings prepared by consultant in connection with the Proposed Project "Design, Engineering, Construction of RCC Intake Jetty with pump House, Gangway, Substation and Allied Civil works for 10P10 KMDA Bally WTP Project Traders & Engineers Private Ltd. PI: Ambarish Ghosh
291 Vetting of Plan and Estimate of New Building of Mahishadal Raj College, Mahishadal Mahishadal Raj College PI: Pranab Kumar Lai
292 Inspection of Vidyasagar Setu alongwith Approach Viaducts & Interchanges Hooghly River Bridge Commissioner, Kolkata PI: Saibal Kumar Ghosh
293 Vetting of Super Structure System of Rajib Gandhi Stadium, Aizwal M/S Minakshi Sarkar PI: Ambarish Ghosh
294 State Technical Agency, Pradhan Mantri Gram Sadak Yojana National Rural Road Development Agency PI: Sudip Kumar Roy
295 Technology & Design of Iron & Arsenic Removal Plant Utpal Construction & Company PI: Anirban Gupta
296 Assessment of vibration from installation of Sheet Piles using a vibro-sinker at SPENCER's GALLERIA Site at 33 Syed Amir Ali Avenue, Kolkata - 700017 CESC Properties Limited PI: Ambarish Ghosh
297 Technical consultancy on Geotechnical study of roof rock, floor and Coal & analysis for gassiness of coal of Muraidih UG Mine, BCCL Minop Innovative Technologies Pvt. Ltd., Kolkata PI: Netai Chandra Dey and Pratik Datta
298 HRBC Reserved Price Assessment Hooghly River Bridge Commissioner, Kolkata PI: Sudip Kumar Roy
299 Design and Detailed Structural Drawing for Covering system at the top level of Married Hostel at Haldia IOCL, Haldia PI: Saibal Kumar Ghosh
300 Consultancy Services for Health Monitoring of under construction residential building at Rajarhat B.E. College Employees Housing Co-operative Society Ltd. PI: Sugato Pal
301 Consultancy Services for Health Monitoring of fire affected LIC building LIC, Kolkata PI: Subrata Chakraborty
302 Brand Ambassador of PMC Prestige brand TMt bars Purulia Metal Casting (P) Ltd. PI: Sanjoy Sadhukhan
303 Vetting of Structural Design & Drawing of Launching Girder (For 31m span) For Rail Vikas Nigam Limited M/S Simplex Infrastructure Ltd. PI: Saibal Kumar Ghosh
304 Siol Exploration work at Plot no. 2647 & 2646, Mouza-Baidyabati Agri-Irrigation, Govt. of West Bengal, Chinsurah Division PI: Ambarish Ghosh
305 Design of PEB Super structure system of Rajib Gandhi Stadium, Aizwal M/S Minakshi Sarkar PI: Ambarish Ghosh
306 Health Monitoring of Silo works at Durgapur Steel Plant, Durgapur Hamon Shriram Cottrell Pvt. Ltd. PI: Saibal Kumar Ghosh
307 Soil Exploration at 6 Sites of Howrah Improvement Trust Howrah Improvement Trust PI: Ambarish Ghosh
308 Design & Detailed Structural Drawings for Construction of (G+3) storied Residential Building in Haldia Refinary Township Indian Oil Corporation Ltd. PI: Saibal Kumar Ghosh
309 Safety Audit: Distribution Network and Generating Station CESC-Kolkata PI: Prof. Bidyut Kr. Bhattacharyya
310 Testing & consultancy for quality control of materials at site laboratory for construction activities of 'URBANA' project - the lattest cluster of residential buildings (G+45) in Kolkata at Anandapur Bengal NRI Complex Limited (A joint sector co. with Govt. of W.B.) PI: Arun Kumar Chakraborty
311 Finite element stress analyses of 40M & 75M steel stacks Descon United Technical Service - Kolkata PI: Prof. Amit RoyChowdhury, Santanu Majumder, Niloy Khutia
312 Consultancy for CBM/UGC Global UGC under Mitchell Group PI: Prof. Pratik Dutta
313 Vetting of (i) Structural Analysis and Design of Superstructure (ii) Design of Foundation System of the Structure for construction of 4th Market Complex at Siliguri Siligury Jalpaigury Development Authority PI: Prof. Ambarish Ghosh
314 Over ground 36” diameter crude oil jetty line at HBCPL, Haldia IOCL, Pipelines Division, Pipelines-Eastern Region PI: Dr. K. K. Chattopadhyay
315 Rock Testing Sardip Consulting Engineers PI: Prof. Pratik Dutta
316 Vetting of estimates of Paschimanchal Unnayan Parisad, Bankura Paschimanchal Unnayan Parisad, Bankura PI: Prof. Pranab Kumar Lai
317 Vetting of Design & Drawing in connection with RCC Intake Jetty, Bhatpara, KMDA Traders & Engineers Pvt. Ltd., Kolkata - 29 PI: Prof. Ambarish Ghosh
318 Vetting of foundation system of Rajiv Gandhi Stadium, Aizwal M/s Minakshi Sarkar on behalf of LLOYD IN SULATIONS (I) Ltd. PI: Prof. Ambarish Ghosh
319 Proposed Development Plan of Eastern Side of Eastern Metropolitan Bye Pass, Salt Lake, Calcutta CMDA PI: Aditya Bandyopadhyay
320 Study on Identification of Counter magnets to National Capital Region National Capital Regional Planning Board PI: Aditya Bandyopadhyay
321 Pilot Project to derive information and Data Structure for Planning in Tribal Areas National Informatics Centre PI: Aditya Bandyopadhyay
322 Traffic and Transportation Survey for NOIDA New Okhla Industrial Development Authority PI: Aditya Bandyopadhyay
323 Planning Work for New Town at Rajarhat Planning Work for New Town at Rajarhat PI: Aditya Bandyopadhyay
324 Preparation of Development Plan for Labhpur Birbhum Zilla Parishad, West Bengal PI: Aditya Bandyopadhyay
325 Preparation of District Development Plan for Howrah District Office of the District Magistrate, Howrah PI: Aditya Bandyopadhyay
326 Development of Information Technology Based Approached for formulation of National Human Settlement Development Policy for INDIA AICTE PI: Aditya Bandyopadhyay
327 Preparation of Draft Development Plan for Dumdum Municipal Area KUSP PI: Aditya Bandyopadhyay
328 Preparation of Draft Development Plan for Gayeshpur Municipal Area KUSP PI: Aditya Bandyopadhyay
329 Preparation of Base Line Survey and prepare Heritage Development Plan inclusive of LUDCP and Heritage Management Plan on Proposed Nabadwip Heritage Town Urban Development & Municipal Affairs Department, Govt. of West Bengal PI: Aditya Bandyopadhyay
330 Calibration of Flow-meter Kolkata Municipal Corporation, Kolkata PI: Dr. Koustuv Debnath
331 Sedimentation and Palaeogeographic model for the Late Proterozoic sequences of the Shimla area and their sub-surface equivalents in the Himalayan foothills Oil and Natural Gas Corporation Ltd. PI: Prof. B. P. Mukhopadhyay
332 Mine Closure Verification Hindalco
333 Sampling of coal of ECL Mines C.C.O PI: Consultant
334 Mine Closure Verification Hindalco
335 Mine Closure Verification NLC India
336 Verification of Subsidence report SovaIspat Ltd.
337 Blast vibration monitoring at Chappi dam, Rajasthan Eltrosteel Castings Ltd.
338 GPS survey at Nabha, Punjab Sardip Consulting Engineers
339 GPS survey at Kulpi Sardip Consulting Engineers
340 Surveying of opencast mines in SECL ICC
341 Blast vibration monitoring HCC
342 Rock testing CESC
343 Physico-mechanical (PMT) properties of rock (UCS, Strain, Point load strength, Direct shear) for Geotechnical Investigation Cement Company PI: Joint Consultant
Consultants: Md Mirajul Islam
344 Progressive mine closure verification for Gare Palma IV/4 and IV/5 mines Hindalco PI: Joint Consultant
Consultants: Md Mirajul Islam
345 Sampling and grade determination of coal of ECL Mines CCO PI: Joint Consultant
346 Scientific study for assessing the long term stability of pillars at Shastry Colliery of Ballarpur Area, WCL
347 Strata Monitoring and Management Plan for Extraction of Developed Pillars in Continuous Miner District, Sarpi Project, ECL
348 Coal Sample Analysis of the Mines of Eastern Coalfields Limited
349 Preparation of Sustainable Development Framework for Dongri Buzurg Mine
350 Strata Monitoring in Continuous Miner District, Sarpi Project, ECL
351 Development of a low cost fuel efficient engine driven bicycle at Flip Motor Corporation Private Limited as a part of Start up India Scheme. Flip Motor Corporation Private Limited as a part of Start up India Scheme. PI: Aritra Ganguly
352 Development and validation of SEQUEL and real time models of various drives and testing and validation of the above ‘Application Models’ in Full Spectrum Simulator Department of Information Technology, Govt. of India Consultants: Kaushik Mukherjee
353 National Mission on Power Electronic Technology (NaMPET) Department of Information Technology, Govt. of India Consultants: Kaushik Mukherjee
354 Design and analysis of IMs for submersible applications-Phase I Shakti Pumps, Indore PI: Mainak Sengupta
355 Design and development of P2 motor for hybrid EVs IIT Kharagpur & Tata Motors Ltd.,Pune ( under UAY, GoI) PI: Mainak Sengupta
356 Design of BLDC drive for ball-screw application Webel ToolsInd, Kolkata PI: Mainak Sengupta
357 Design of 240kW, IGBT based buck – chopper Webel Mediatronics, Kolkata PI: Mainak Sengupta
358 Vetting of structural design of proposed Library Building & PG Building of Prabhat Kumar College, Contai. Haldia Development Authority PI: Tapash Kumar Roy
359 PROOF CHECKING OF DESIGN AND DRAWING OF PAVEMENT DESIGN OF BOTH RIGID AND FLEXIBLE FOR FOUR ADDITIONAL LANES WITHIN THE JURISDICTION OF SVB TOLLY PLAZA BUILDING Second Vivekananda Bridge Tollway Company Pvt Ltd PI: Tapash Kumar Roy
360 Vetting of roadway and other structural design for Haldia Development Authority Haldia Development Authority PI: Tapash Kumar Roy
361 Technical vetting of Design pertaining to culvert/bridge below approach road for LPG Import Facility Project of M/s BPCL at Haldia Bharat Petroleum Corporation Limited (BPCL) PI: Tapash Kumar Roy
Consultants: Tapash Kumar Roy
362 Technical vetting of Design pertaining to overhead pipes way bridge (PWD) crossing HPL link road for LPG Import Facility Project of M/s BPCL at Haldia Bharat Petroleum Corporation Limited (BPCL) PI: Tapash Kumar Roy
363 Preparation of rain water harvesting (RWH) and artificial water recharges (AWR) for Khagra Joydev Coal Block (KJCB) Khagra Joydev Resources Pvt. Limited PI: Ujjwal Saha
364 Construction of Weir at Darakeshwar River near Pump House at Adra under South Eastern Railway Modern Construction Company PI: Ujjwal Saha
365 Climate Smart Decision Support System-GUI for Malaysian Rice Irrigation Scheme University Putra Malaysia (UPM) PI: Ujjwal Saha
366 Construction of Proposed Major Culvert over Channel Dehati at Kolaghat, Purba Medinipore HDA PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
367 Modification of Existing Approach Trestle at Third Oil Jetty at Haldia. Kolkata Port Trust (Haldia Dock Complex) PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
368 Proposed Sub-Station at G.C. Berth Haldia Dock Complex Kolkata Port Trust (Haldia Dock Complex) PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
369 Proposed Construction of Pipe Carrier Structural Bridge (Approx. 88.15m Long) HDA PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
370 Superstructure of Composite Steel Girder of Proposed Bardhaman ROB Rail Vikas Nigam Ltd. (RVNL) PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
371 Preparation of DPR for construction of ANNEX building MAHANADI COALFIELDS LIMITED (MCL) PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
372 Construction of Annexe Building of Haldia Bhawan HDA PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
373 Planning, Design and Construction of 5 Medical Colleges in the State of West Bengal for WBMSCL West Bengal Medical Services Corporation Ltd.(WBMSCL) PI: Dr. K. K. Chatterjee
Consultants: Dr. A. Ghosh & Dr. S.K. Dalui
374 Design and Construction Of Pedestrianisation & Traffic decongestion of Dakshineswar Temple Area on Turnkey Basis Under State Fund. Kolkata Metropolitan Development Authority PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
375 Four Storied Class Room Building of Moyna College-2nd Building Moyna College authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
376 Renovation, Rehabilitation and Strengthening of Old Arched Masonry Bridge over river Banka at Birhata on G. T. Road Burdwan BDA PI: Dr. S.K. Roy
Consultants: Dr. S.K. Dalui, Dr. A. Ghosh & Dr. T.K. Roy
377 Vetting of Design and Drawing of B+G+10 Residence for Hon’ble Minister of Govt. of West Bengal at Alipore, Kolkata National Building Construction Corporation Ltd PI: Dr. S.K. Dalui
Consultants: Dr. A. Ghosh & Dr. T.K. Roy
378 Vetting of Design and Drawing of B+G+2 Kolkata House of Govt. of West Bengal at Alipore, Kolkata National Building Construction Corporation Ltd PI: Dr. S.K. Dalui
Consultants: Dr. A. Ghosh & Dr. T.K. Roy
379 Four Storied Class Room Building of Moyna College-1st Building Moyna College authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
380 Vetting of Structural design and estimation of Mahishadal Mukta Mancha HDA PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
381 Civil design & construction of 0.5 MG semi-underground reservoir-cum pumping station & ancillary building. Kolkata Municipal Corporation PI: Dr. S. Ghosh
Consultants: Dr. S.K. Dalui
382 Vetting of (G+3) storied college building at Viveknagar, Chaitanyapur, Sutahata, Purba Medinipur, W.B Vivekananda Mission Mahavidyalaya authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui & Prof. P.K. Lai
383 Rebound Hammer test for Construction of 2/3 storied Building, H.S. School and Primary School Building, Sagar, South-24 Pargana (WB) (HRBC) ST. Georges Gate Road Kolkata: 700021 PI: Dr. S. Ghosh
384 Vetting of Multi-storeyed Building For Maharaja Nanda Kumar Mahavidyalaya, HDA_Maharaja Nanda Kumar Mahavidyalaya authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui
385 Vetting of RADAR Tower at Dadanpatra. Kolkata Port Trust PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
386 Proof Checking of Detailed Design and Drawing of the foundation of Railway Bridge: in connection with gauge conversion work of Sakri-Nirmali & Jhanjharpur-Laukaha Bazar Section, East Central Railway. BPC India PVT. LTD. PI: Dr. A. Ghosh, Dr. S.K. Dalui
Consultants: Prof. Sandip Chakraborty & Dr. A. Adak
387 Vetting of Design and Estimation of P.K. College building. P.K. College authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui & Prof. P.K. Lai
388 Vetting of Dedicated Water Supply System for IOCL, Refinery Haldia Haldia Integrated Development Agency Ltd, Haldia. PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui & Prof. P.K. Lai
389 Design of Super Structure and Foundation of Multi- Speciality Hospital (G +3) storied at Lalbag, Murshidabad. M/S Fortune Multi-Speciality Hospital PVT. LTD. PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
390 Vetting of Residential Building (G+7) storied at Premises No. 89-MAR (SE) Plot No. DC 205. Setu Co-operative Housing Limited. PI: Prof. A.K. Chakraborty
Consultants: Dr. S.K. Dalui & Dr. A. Ghosh
391 Vetting of Superstructure of Aizwal stadium, Aizwal. Minakshi construction PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
392 Vetting of Design and Estimation of Mahishadal Raj College building. Mahishadal Raj College authority PI: Dr. T.K. Roy
Consultants: Dr. S.K. Dalui & Prof. P.K. Lai
393 Non Destructive Testing (NDT) of Presidency College Building, Kolkata Presidency College authority PI: Dr. S. Ghosh
Consultants: S. Pal & Dr. S.K. Dalui
394 Testing of Paver Block at manufacture point, Panagorh Calcutta Port Trust (CPT) PI: Dr. S. Ghosh
Consultants: Prof. S. Pal & Dr. S.K. Dalui
395 Vetting of Foundation system of Aizwal stadium, Aizwal. Minakshi construction PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
396 Design of Foundation system and Vetting of Structural analysis of 4th Market Complex, at Siliguri Siliguri Jalpaiguri Development Authority PI: Dr. A. Ghosh
Consultants: Dr. S.K. Dalui
397 Vetting of BOQ for Mega Food Park Project at Tripura M/s Sikaria Mega Foodpark (P) Ltd PI: Dr. Saibal Ghosh
Consultants: Soumya Bhattacharjee
398 Inspection Of Vidyasagar Setu Along With Approach Viaducts & Interchanges Vice Chairman, Hooghly River Bridge Commissioner (HRBC), PI: Soumya Bhattacharjee
399 Third Party Consultant for the project titled ‘1829 mm (OD) MS transmission pipe line from intake works at Rani Debendrabala Ghat on River Hooghly to Water treatment Plant at New Town in Action Area – 1A for 100 MGD Transmission Capacity Public Health Engineering Department (PHED), Government of West Bengal PI: Soumya Bhattacharjee
400 Installation of 4 Nos, of Arsenic Removal Units in Nadia District School of Environmental Studies, Jadavpur University PI: Debabrata Mazumder
401 Improvement of Treatment Capacity of Activated Sludge Process by Adoption of Hybrid Technology All India Council for Technical Education (AICTE) PI: Debabrata Mazumder
402 Post Construction Inspection of Sewer Line Work at Doomrajala Scheme – I, Phase II Work Howrah Improvement Trust PI: Dr. Asok Adak
403 Proof Checking of Detailed Design and Drawing of the Foundation of Railway Bridges: in connection with gauge conversion work of Sakri Nirmali & Jhanjharpur - Laukaha Bazar Section, East Central Railway B.P.C. India Pvt. Ltd PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak
404 Vetting of Hydraulic Design and Drawing of Storm Water Drainage System of lake Gardens Area under Borough – X of KMC followed by proposal of Drainage Pumping Station Comtel Consultants & Infraprojects Pvt. Ltd PI: Dr. Ambarish Ghosh
Consultants: Dr. Asok Adak
405 Analysis of impact on environment and propose necessity of EIA study for the proposed conversion of 2 Naphtha Storage Tank to High Speed Diesel at POL storage Depot, Bharat Petroleum Corporation Limited, Shahjahanpur, UP Sonar Bharat Environment & Ecology Pvt. Ltd. PI: Dr. Asok Adak
406 Feasibility Report on Shifting of Toilet of Chamber No. 4 at 1st Floor of Main Building, Hon’ble High Court, Calcutta Executive Engineer, Public Works Department (PWD), Calcutta West Division, 8th Floor, B Block, New Secretariat Building PI: Dr. Kalyan Chottopadhyay
Consultants: Dr. Asok Adak
407 Tunnel effluent sample analysis and associated mitigation measures TRANSTONNELSTROY – AFCONS J. V., UG1, Kolkata East-West Metro Project PI: Dr. Asok Adak
408 Preparation of EIA-EMP Report and River Bank Protection in 6 MGD Intake Jetty with Pumping Station at Halisahar under KMDA Area KMDA Area PI: Dr. Debabrata Mazumder
Consultants: Dr. Asok Adak
409 Proposal for Artificial Recharge and Rainwater Harvesting Scheme for Joydev Coal Block at Birbhum District, West Bengal Khagra Joydev Resources Private Limited PI: Dr. Asok Adak
410 Design, engineering, procurement, construction and completion of 7.4 km, 2(two) lane elevated Road between Jinjira Bazar and Batanagar on Budge Budge Trunk Road in Kolkata along with the widening of the existing 2 (two) lane road by addition of two lanes on both sides of the elevated fly – over through construction of an at grade road and construction of a 1.5 m footpath at the side of at grade roads - Proposal for Vetting of detail design of road, substructure and superstructure. L&T PI: Ambarish Ghosh
411 Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road) ILFS PI: Ambarish Ghosh
412 Field Quality Assessment for Concrete and Soil for Bakreshwar Thermal Power Project BHEL, India PI: Ambarish Ghosh
413 Testing of Dredged Soil at Haldia HAM, Holland DCI, India PI: Ambarish Ghosh
414 Soil Exploration Work at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( six sites) HOWRAH IMPROVEMENT TRUST
415 Soil Exploration at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( ten sites) HOWRAH IMPROVEMENT TRUST PI: Ambarish Ghosh
416 Soil Exploration Work at Five Sites at Burdwan Medical College Campus P. W. (CB) Directt. PI: Ambarish Ghosh
417 Planning and Design of Hospital Building at LALBAGH, MUSHIDABAD M/s Fortune Multi-specialty Hospital Pvt. Ltd. PI: Ambarish Ghosh
418 Vetting of detail design of substructures and superstructure of Chandan Nagar ROB of KMDA Flyovers and ROBs excluding span between P19 and P20 along with the proposed road including the minor bridge over river Saraswati M/S Larsen & Toubro Limited, Construction Infrastructure IC PI: Ambarish Ghosh
419 Soil Exploration Work two colleges, one university and six BLRO Office Sites at Burdwan P. W. (CB) Directt. PI: Ambarish Ghosh
420 Soil Exploration Work at three Plots of HIT Howrah Improvement Trust PI: Ambarish Ghosh
421 Pre tender design advisory consultancy for “Design and construction of 578 m long Theng tunnel including geological investigation and studies, design of tunnel and construction of tunnel proper including Civil as well as Electrical/Mechanical works along with approaches at KM 86.9 on Gangtok-Chungthang road under project Swastik in Sikkim state” M/S ITD Cementation India Limited PI: Ambarish Ghosh
422 Renovation, rehabilitation and Strengthening of old arch masonary bridge over river Banka at Birhata on G.T. Road Burdwan Burdwan Development Authority PI: Ambarish Ghosh
423 Review on the Structural Safety of River Crossing Transmission Tower across River Hooghly pertaining to 400KV Double Circuit Haldia-Subhasgram Transmission Line M/S Haldia Energy Limited PI: Ambarish Ghosh
424 Consultancy services for Project Preparation of Package III: Mogra-Kampa-Barojaguli in the Hooghly and Nadia District of West Bengal, India including Major Bridge over River Saraswati, ROB at Bansberia, Elevated Corridor at Junction of Barrackpore Expressway, Interchange at Kampa Junction and State of Art Extradosed Cable Stayed Bridge ( over river Ganges-Hooghly) RITES LIMITED PI: Ambarish Ghosh
425 Stability test of Dyke/ Embankment through the proposed Navigational Channel across Nayachara Island as a Long Term Measures of KoPT WAPCOS Ltd. PI: Ambarish Ghosh
426 Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road) from Kestopur to Jora Mandir IL&FS Infrafrastructure Development Corporation Limited PI: Ambarish Ghosh
427 Geotechnical Investigation for the Construction of Proposed RCC Bridge over River Bidya connecting Godkhali and Gosaba Bazar in the District of South 24 Parganas, Highway Survey Division – III P. W. (Roads) Directorate Bhabani Bhawan, Kolkata 700 027 PI: Ambarish Ghosh
428 Kolkata East West Metro Project KMRCL ( Govt. of India Undertaking) PI: Ambarish Ghosh

Created: 23 November 2019