Pre-loader

Consultancy Projects

Sl Title Client Organisation PIs
1 Preparation of Diversion plan of river Sukri and nallas passing through Tubed Coal Mine, Dist. Latehar, Jharkhand (PI) Develecto Mining Limited PI: Dr. Asok Adak
Consultants: Dr. Ujjwal Saha, Dr. Sujit Kumar Dalui, Dr. Soumya Bhattacharyay, Sandip Chakraborty and Prof. Ambarish Ghosh
2 Vetting of drawing/design related to process engineering, hydraulics, civil, structural and electromechanical works, etc. for 100 MGD water treatment plant at Uluberia WPIL PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak and Dr. Sujit Kumar Dalui
3 Reviewing, checking, vetting of design and drawing, etc. for 40 MGD water treatment plant within Mahestala Municipality TRADERS & ENGINEERS PRIVATE LIMITED PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak and Dr. Sujit Kumar Dalui
4 EIA/EMP Report in respect of Construction of a Steel Pontoon Jetty in the Premises of Shalimar Works Limited, Howrah PI: Prof. Debabrata Mazumder
Consultants: Dr. Chanchal Majumder and Dr. Asok Adak
5 Preparation of Catchment Area Treatment Plan for Tubed Coal Mine, Dist. Latehar, Jharkhand Develecto Mining Limited PI: Dr. Asok Adak
Consultants: Dr. Ujjwal Saha and Sandip Chakraborty
6 Post Construction Inspection of Sewer Line Work at Doomrajala Scheme – I, Phase II Work Howrah Improvement Trust PI: Dr. Asok Adak
7 Proof Checking of Detailed Design and Drawing of the Foundation of Railway Bridges: in connection with gauge conversion work of Sakri Nirmali & Jhanjharpur - Laukaha Bazar Section, East Central Railway B.P.C. India Pvt. Ltd PI: Prof. Ambarish Ghosh
Consultants: Dr. Asok Adak
8 Vetting of Hydraulic Design and Drawing of Storm Water Drainage System of lake Gardens Area under Borough – X of KMC followed by proposal of Drainage Pumping Station Comtel Consultants & Infraprojects Pvt. Ltd PI: Dr. Ambarish Ghosh
Consultants: Dr. Asok Adak
9 Analysis of impact on environment and propose necessity of EIA study for the proposed conversion of 2 Naphtha Storage Tank to High Speed Diesel at POL storage Depot, Bharat Petroleum Corporation Limited, Shahjahanpur, UP Sonar Bharat Environment & Ecology Pvt. Ltd. PI: Dr. Asok Adak
10 Feasibility Report on Shifting of Toilet of Chamber No. 4 at 1st Floor of Main Building, Hon’ble High Court, Calcutta Executive Engineer, Public Works Department (PWD), Calcutta West Division, 8th Floor, B Block, New Secretariat Building PI: Dr. Kalyan Chottopadhyay
Consultants: Dr. Asok Adak
11 Tunnel effluent sample analysis and associated mitigation measures TRANSTONNELSTROY – AFCONS J. V., UG1, Kolkata East-West Metro Project PI: Dr. Asok Adak
12 Preparation of EIA-EMP Report and River Bank Protection in 6 MGD Intake Jetty with Pumping Station at Halisahar under KMDA Area KMDA Area PI: Dr. Debabrata Mazumder
Consultants: Dr. Asok Adak
13 Proposal for Artificial Recharge and Rainwater Harvesting Scheme for Joydev Coal Block at Birbhum District, West Bengal Khagra Joydev Resources Private Limited PI: Dr. Asok Adak

Created: 23 November 2019