Pre-loader

Consultancy Projects

Sl Title Client Organisation PIs
1 Technical Consultancy for Structural Stability Test of Concrete and Steel Structures of Ropeway transport system at Bagru Mines. Hindalco Industries Limited (Mines Division) PI: Prof. (HAG) N.C Dey
2 Construction of 2nd Bridge over River Baitarani at Chandabali on Bhadrak-Chandabali Road on Turnkey Basis Mackintosh Burn Limited PI: Prof. Tapas Kumar Roy
3 Improvement of two lane with paved shoulder from Ramnagar to Roseda from (Km 3+500 to Km 45+000) of NH-527E in the State of Bihar M/S Ram Kripal Singh Pvt. Ltd. Ranchi
4 GEOTECHNICAL STUDY REPORT ON HIGHWALL MINING AT T-2 C and T-2 A IN SHARDA OCM (BAKHI PATCH) OF SOHAGPUR AREA, SOUTH EASTERN COALFIELDS LIMITED MINSOL Limited, Kolkata PI: Prof. (HAG) N. C Dey
5 Model Shaft for 1MPS 13 Capacity (884 kgs) Elevator LT Elevator Pvt Ltd PI: Dr. Apurba Das
6 Geotechnical Study for Suitability of Civil Work for Vanabar Ropeway Section - I, Gaya, Bihar. Damodar Ropeways and Infra Limited PI: Dr. Apurba Das
Consultants: Dr. Saptarshi Kundu
7 GEOTECHNICAL STUDY REPORT ON HIGHWALL MINING AT NIMCHA COLLIERY, SATGRAM AREA, EASTERN COALFIELD LTD MINSOL Limited, Kolkata PI: Prof. (HAG) N. C Dey
Consultants: Dr. Saptarshi Kundu
8 Design and planning of construction of Railway Wagon Facility for Ramsarup Industries Ltd, Kharagpur Ramsarup Industries Ltd, Kharagpur PI: Dr. Apurba Das
Consultants: Prof. Amit Roy Chowdhury and Dr. Saptarshi Kundu
9 Model Coal Sample Preparation for TARA (E&W) Coal Mines to achieve VM:17%-20% and GCV:GI2(3700-4000) & G13(3400-3700)Kcal/kg The West Bengal Power Development Corporation Limited
10 Scientific study of West Kenda OCP of New Kenda colliery, Kenda Area, ECL as per regulation no. 138(1) and 37(2) c of CMR-2017, proposal for dealing/ sealing of fire in the developed galleries of disused working of R-Vl seam and stabilization of ground in the pot hole/ subsided area Eastern Coalfields Limited (ECL) PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
11 Scientific monitoring of dump and pit slope stability by determining FOS and pore pressure at Basantimata Dahibari Colliery under CV area of BCCL Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
12 Preparation of Geotechnical report on Highwall mining at Amalgamated Amlo Dhori MINSOL Limited PI: Prof. (HAG) N.C Dey
Consultants: Dr. Dipankana Bhattacherjee
13 Widening/ Improvement to 4 (Four) Lane with Paved Shoulder of existing single lane from Srirampur (near Bhairiguri village) to Kachukhana Harichara Paglagaunj Section (PKG -I) of Srirampur to Dhubri Road of newly declared NH-127B of existing KM 0.000 to KM28.050 (Design KM. 0.000 to KM. 27.650), (Design Length= 27.650km) on EPC Bas is in the state of Assam under JICA Simplex Infrastructures Limited PI: Prof. Tapas K Roy
Consultants: Dr. Sujit Kumar Dalui and Dr. Dipankana Bhattacherjee
14 Scientific Study for determining the Safe Method of Working, Ultimate Pit Slope and Dump Slope with Monitoring of Slope Stability of Basantimata- Dahibari Colliery Under CV AREA-XII, BCCL. Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
15 Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode, BLAPPL-GPPL (Joint Venture) PI: Prof. Tapas K Roy

Created: 23 November 2019