Pre-loader

Consultancy Projects

Sl Title Client Organisation PIs
1 Improvement of two lane with paved shoulder from Ramnagar to Roseda from (Km 3+500 to Km 45+000) of NH-527E in the State of Bihar M/S Ram Kripal Singh Pvt. Ltd. Ranchi
2 GEOTECHNICAL STUDY REPORT ON HIGHWALL MINING AT T-2 C and T-2 A IN SHARDA OCM (BAKHI PATCH) OF SOHAGPUR AREA, SOUTH EASTERN COALFIELDS LIMITED MINSOL Limited, Kolkata PI: Prof. (HAG) N. C Dey
3 Model Shaft for 1MPS 13 Capacity (884 kgs) Elevator LT Elevator Pvt Ltd PI: Dr. Apurba Das
4 Geotechnical Study for Suitability of Civil Work for Vanabar Ropeway Section - I, Gaya, Bihar. Damodar Ropeways and Infra Limited PI: Dr. Apurba Das
Consultants: Dr. Saptarshi Kundu
5 GEOTECHNICAL STUDY REPORT ON HIGHWALL MINING AT NIMCHA COLLIERY, SATGRAM AREA, EASTERN COALFIELD LTD MINSOL Limited, Kolkata PI: Prof. (HAG) N. C Dey
Consultants: Dr. Saptarshi Kundu
6 Design and planning of construction of Railway Wagon Facility for Ramsarup Industries Ltd, Kharagpur Ramsarup Industries Ltd, Kharagpur PI: Dr. Apurba Das
Consultants: Prof. Amit Roy Chowdhury and Dr. Saptarshi Kundu
7 Model Coal Sample Preparation for TARA (E&W) Coal Mines to achieve VM:17%-20% and GCV:GI2(3700-4000) & G13(3400-3700)Kcal/kg The West Bengal Power Development Corporation Limited
8 Scientific study of West Kenda OCP of New Kenda colliery, Kenda Area, ECL as per regulation no. 138(1) and 37(2) c of CMR-2017, proposal for dealing/ sealing of fire in the developed galleries of disused working of R-Vl seam and stabilization of ground in the pot hole/ subsided area Eastern Coalfields Limited (ECL) PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
9 Scientific monitoring of dump and pit slope stability by determining FOS and pore pressure at Basantimata Dahibari Colliery under CV area of BCCL Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
10 Preparation of Geotechnical report on Highwall mining at Amalgamated Amlo Dhori MINSOL Limited PI: Prof. (HAG) N.C Dey
Consultants: Dr. Dipankana Bhattacherjee
11 Widening/ Improvement to 4 (Four) Lane with Paved Shoulder of existing single lane from Srirampur (near Bhairiguri village) to Kachukhana Harichara Paglagaunj Section (PKG -I) of Srirampur to Dhubri Road of newly declared NH-127B of existing KM 0.000 to KM28.050 (Design KM. 0.000 to KM. 27.650), (Design Length= 27.650km) on EPC Bas is in the state of Assam under JICA Simplex Infrastructures Limited PI: Prof. Tapas K Roy
Consultants: Dr. Sujit Kumar Dalui and Dr. Dipankana Bhattacherjee
12 Scientific Study for determining the Safe Method of Working, Ultimate Pit Slope and Dump Slope with Monitoring of Slope Stability of Basantimata- Dahibari Colliery Under CV AREA-XII, BCCL. Bharat Coking Coal Limited PI: Prof. (HAG) N. C Dey
Consultants: Dr. Dipankana Bhattacherjee
13 Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode, BLAPPL-GPPL (Joint Venture) PI: Prof. Tapas K Roy

Created: 23 November 2019